Alterations and renovations to the existing office/production facility in Pennsauken involved creating accessible access to entire building in which the company manufactures and distributes packaging for the pharmaceutical industry. Specifically, the scope of the project included the reconfiguration of building’s main entrance and lobby area as well as the installation of a passenger elevator to access the building’s second-floor office mezzanine.